Template018-Sliced
| |
|
- |
Rewiring the
grounding system to ensure proper bonding of all electrical
connections. Isolated ground system is preferable for a
building which have large nonlinear load. |
|
- |
Enhanced earth
electrode systems, including buried ground rings or multiple
ground rods to ensure very low resistance to ground. |
|
- |
Replacement or
upgrading of undersize phase conductors to reduced voltage
drop. |
|
 |
|
|
 |
|
- |
Use double size
neutral conductors or separate neutral for each phase. |
|
- |
Segregate
sensitive loads on separate branch circuits, fed from a
separate panel board and allowing fewer outlets per circuit. |
|
- |
Use harmonic
filters |
|
- |
Use power
conditioners (TVSS) |
|
- |
Use delta-wye
transformers design for nonlinear loads. |
|
|
However the
final recommendation for mitigation procedures will be proposed
after the final analysis have been made. These mitigation works
are not included in the propose scope of work. |
|
|
|
|
|